Here's a look at some of our most recent projects...
2015:
Location: Tilden, Tx
Scope: Fab and install HP fuel gas slug catcher heavy sands blast internal nozzle system, install sand knock out filter vessel, relocate existing flare, with fab and installation of all associated piping. (H2S critical)
2016:
Location: Tunkhannock, PA / Williamsport, PA
Scope: Multiple plant retrofits of an EPA regulated underground piping ESD blow down system with vent stacks.
2015:
Location: Cuero, TX
Scope: Deliver, set and install (3) Compressors. Fab and install all associated piping and supports.
2015:
Location: Kennedy, TX
Scope: Fab and install pipe racks, pipe and equipment for truck load out addition to plant. Dual H2S skids added scope.
2016:
Location: Karnes City, TX
Scope: Piece weld, assemble, and install/set 180' tall 8' base diameter Zeeco Flare stack with retractable pilot system.